1. Ground treatment
1.1 Clean up the site: Before installation, it is necessary to ensure that the site is clean and level, remove potholes and gravel on the ground, and ensure that the ground flatness meets the requirements.
1.2 Laying a flexible waterproof layer: After the foundation treatment is completed, a flexible waterproof layer needs to be laid on the ground to prevent moisture from entering the foundation.
Second, make the keel
2.1 According to the design drawings, make the keel: according to the requirements of the design drawings, measure and determine the length, width and thickness of the keel, and then carry out processing, punching and other work.
2.2 Selection of processing materials: When selecting materials, they should be considered from the aspects of quality, hardness, strength, and anti-corrosion performance to ensure that the materials meet the national quality standards.
3. Fixation method
3.1 Selection of fixing methods: According to the environment and use requirements of the installation site, select the appropriate fixing methods, including self-tapping screws, rivets, external card and other fixing methods.
3.2 Installation of keel: Install the made keel in a fixed position according to the spacing, and fix it with tools.
Fourth, the installation of the overlay
4.1 Selection of covering material: The selection of covering material should consider its fire performance, waterproof performance, sound insulation performance and other requirements to ensure that it meets the specified standards.
4.2 Overlay production: according to the requirements of the design drawings, the materials are processed according to the requirements, such as cutting, welding, etc.
4.3 Installation of the overlay: The finished overlay is installed according to the spacing of the keel, and fixed with tools.
5. Precautions after the installation is completed
5.1 Check the fixing situation: After the installation is completed, the fixing condition of each process should be checked in time to ensure that the fixing is firm and reliable.
5.2 Clean up the debris on it: After the installation is completed, clean up the debris on it in time to keep the surface of the laminated board clean, beautiful and reliable.
5.3 Check the waterproof performance: After the installation is completed, the waterproof performance needs to be checked, and if the waterproof requirements cannot be met, supplementary measures need to be taken.
In short, the process of laminating the installation of the laminate board needs to go through a rigorous construction process and strict supervision and control. The quality of the installation can only be ensured if the installation specifications and standards are strictly followed. Hopefully, this article will help you and get you to grips with laminate installation tips.